Packing&Shipping information and pictures of Stainless Steel plate flanges |
Port:Shanghai Port or Ningbo Port,China |
MOQ:1pieces |
Supply ability:5,000 pieces/month |
Payment terms:T/T,Western Union, Paypal, L/C |
Packaging:Shrink Wrap-Carton Case-Exporting Plywood Case |
Delivery time:Depends on quantity |
Shipping mode:By sea,by air,by express |
| | | | | | | | |
Our Service |
| | | | | | | | |
On Samples | Buyer bear the air fee, but this fee will be reduced from order directly |
On After Sales | Free replacement if there is any quality problem |
On Delivery | Never delay delivery time |
On Materials | Ensure material pure |
Advantages | Please contact our After-sales service department in time within 30days after you received the |
cargo. |
| |
.- 6:00 p.m. (Beijing time) |
Process | Please provide the copy of Sales Contract and describe the problems appeared. |
Problems confirmation: | Slight problem: Please send the proof to our After-Sales Department, we will reply within two |
days. |
Serious problem: |
a.We will dispatch our Quality and Problems Appraisers to make a confirmation |
b.Have a negotiation of the compensation and sign agreements |
c.Our After-Sales Department will perform the duties as the agreements |
Company strength | 1. 10 years of product experience |
2. 5 years of export experience |
3. Pass TS Certificate |
4.Experienced R&D Department |
5.Reliability |
6.Reputation |
7.Buyer's Specifications Accepted |
8.Production Capacity |
| | | | | | | | |
FAQ: |
1. Are you a trading company or factory? We are a manufacturing factory. |
|
2. Do you have MECHANICAL certificate for the materials? Yes, MECHANICAL CERTIFICATE is very important |
for the products. |
|
3. How do you control the quality? |
Quality control is very important to avoid material mixing and poor quality. We control the quality from beginning to |
the end. We have 304 /316L and many other different materials. 100% inspection on raw materials. After material |
determination, strictly follow the approved drawings for production, After the completion of mechanical production, |
Our quality inspector will confirm the material and size again, pick out the unqualified products and confirm the quantity |
before typing. Before packing, we will record in the form of photos and then seal the case for reinforcement.Every step |
is to ensure the quality of the products.This is our experience. |
|
4. About chemical components |
This is first concerning for customers. We take our materials to our laboratory for each lot. You may ask for |
the laboratory report any time. |
|
5. If there is any quality problem, how do you solve it? |
We are very proud that we never let one customer leave us. We are not 100% perfect, there is some quality problem. |
We try our best to provide the best materials in the beginning, and produce in strict accordance with standards or |
drawings, so we can reduce the probability of problems. Customer satisfactions are our biggest pursuit. If unfortunately, |
quality problems occur, then we must take the preservation of the interests of customers as the primary purpose, |
at any cost to satisfy customers. |
|
6. How long is your delivery time? For normal products in 7-10 days; For bulk order, in 15-25 days. It depends. |
|
7. Warranty |
One year warranty for all of our stainless steel products. Gaskets are not included due to the different application |
for customers. |
8. More questions are appreciated. |
We specialize in sanitary valves,pipe fittings and pumps,which is applied for milk,food,beer,pharmaceutical and |
other fields.We can quote you favourable price&high quality&best after-sale services.Welcome to visit our factory |
|
1. Stainless steel flange |
Stainless steel plate flange |
Stainless steel slip on flange |
Stainless steel welded neck flange |
Stainless steel blind flange |
Stainless steel socket weld flange |
Stainless steel integral flange |
Stainless steel threaded flange |
Stainless steel Loose flange / lap joint flange |
Stainless steel non-standard flange |
2. Sanitary Pipe Fittings |
Sanitary Elbow |
Sanitary TeeSanitary Reducer |
Sanitary Cross |
Sanitary Triclamp Ferrule |
Sanitary Cap |
Sanitary Pipe Hanger |
Sanitary Tank Cleaning Ball |
Sanitary Hose Joint |
Sanitary Unions |
Sanitary Sight Glass |
Sanitary Strainer |
3. Stainless steel industrial Pipe Fittings |
Stainless steel Elbow |
Stainless steel Reducer |
Stainless steel Cross |
Stainless steel Ferrule |
Stainless steel Cap |
Stainless steel Tee |
Stainless steel lap joint stub end |
Stainless steel nipple |
Stainless steel coupling |
4. Sanitary Manways |
Sanitary Round Manway without Pressure |
Sanitary Round Manway with Pressure |
Sanitary Square Manway |
Sanitary Oval Manway |
5.Sanitary Gasket |
Silicone/EPDM Gasket for Triclamp |
Silicone/EPDM Gasket for Union |
Silicone/EPDM Gasket for Butterfly Valve |
Silicone/EPDM Gasket for Manhole Cover |
|
Welcome to contact us for Stainless Steel pipe fittings |